The part of a concrete slab that decides how long it stays level is the part you never see. Under every good driveway, walk and patio is a prepared, compacted base. Under most failed ones is a base that was thin, loose or wet. Here's what goes under a slab and why each step matters.
Get a Free EstimateDigging to depth
The job starts by digging out the area to the depth needed for the base and the slab. That means removing topsoil, roots and organic material, which compress and decay over time. Soil that's soft, wet or full of debris is dug out further and replaced.
On a replacement, the old concrete comes out first and the ground underneath gets a close look. Old soft spots, an old trench for a buried line, or a low area where water has collected for a long time all get dealt with before any base goes in.
The granular base
On top of the prepared ground goes a layer of granular base material, crushed stone that locks together when compacted. The base does several jobs. It gives the slab a firm, even surface to rest on. It spreads the load of a car, a table or a person across the ground below. And it lets water move away from the underside of the slab rather than soaking the soil directly beneath.
How thick the base is depends on the slab and the ground. A driveway on soft soil needs more support than a walk on firm ground.
Compaction
Compaction is the step that matters most and is easiest to skip. Loose base material looks fine before the concrete goes in, but it settles under weight and water. When it settles, the slab above it sinks or cracks.
Compacting the base with a plate compactor or roller packs the material tight, so it won't move later. On thicker bases, material is placed and compacted in layers so the whole depth is firm, not just the top.
Grading for slope
The base is graded to match the planned slope of the finished slab. If the surface should fall away from the house toward the yard, the base falls the same way. That keeps the slab an even thickness and helps any water that gets underneath move in the right direction.
Forms are then set at the planned heights, so when the concrete is struck off, the surface takes on the slope.
Why water is the enemy
Most slab failures come back to water. Water that collects under a slab softens the base and the soil below it. In winter, it freezes and expands, pushing up on the slab, then thaws and leaves a void. Do that through many winters and the slab heaves, drops or rocks.
Good drainage starts above the slab, with a slope that sheds water. It continues below, with a base that lets water move instead of pooling. Downspouts emptying beside a slab can put a lot of water in one place, so it's worth pointing them out when we see the job.
Wet ground and pour dates
Base work needs workable ground. A saturated yard can be too soft to compact properly or for equipment to cross without damage. When the ground is too wet, the right call is to wait, even if it moves the pour date.
Reinforcement sits above the base
Where a slab calls for reinforcement, it's placed after the base is compacted and graded, supported so it ends up within the concrete rather than lying on the base. Reinforcement lying on the ground does very little, because once the concrete is poured around it, it sits at the very bottom of the slab instead of inside it. The base and the reinforcement work together: the base keeps the slab evenly supported, and the reinforcement holds pieces together if a crack forms. Neither one makes up for the other being skipped. On a driveway, where both carry vehicles, getting both right matters most.
What to ask about
When you compare estimates, look for how the base will be prepared. Ask how deep it will be, how it will be compacted, and how soft spots will be handled. A quote that doesn't mention the base is pricing a different job, and the difference shows up later, after the concrete has settled.
Free estimate
Get your free estimate
What happens next
- 1You send the form.
- 2We get in touch.
- 3We come look at the job.
- 4We go over the plan.
- 5You decide.