A garage floor takes a lot: the weight of a car, salty slush dripping off it all winter, and water that often has nowhere to go. When the floor cracks into pieces, heaves at the middle or sinks into puddles, it's usually time for a new slab. Here's what replacing a garage floor involves, so you can plan around it.

Get a Free Estimate

Signs it's time

Garage floors crack, and hairline cracks alone aren't usually a reason to replace one. The signs that point to replacement are sections that have heaved or sunk so the floor is uneven, wide cracks where one side sits higher than the other, pieces that rock when driven over, and puddles that sit on the floor after the car has dripped.

A floor that's still level and solid with only a worn, scaled top may be a candidate for resurfacing instead. We'll tell you which after seeing it.

Emptying the garage

The floor has to be completely clear before the old slab can come out. That means moving the car, shelves, workbenches, bikes, tools, bins and everything else stored on the floor. Anything mounted on the walls can usually stay, but items stored low near the floor should be moved, since the work happens right at the base of the walls.

Plan where everything will go while the work is done and the new floor cures. That's often the biggest part of the job for the homeowner.

Taking out the old floor

The old slab is broken up, loaded out through the door and hauled away. Working inside walls on three sides is different from breaking out an open driveway, and the noise is concentrated inside the garage. Care is taken along the base of the walls so the walls aren't disturbed.

Once the old concrete is out, the ground underneath gets a look. Soft spots, voids and wet areas are common under heaved or sunken floors, and they're dealt with before the new base goes in.

Base and slope

The ground is graded and a granular base is spread and compacted. The base is set to the slope the new floor needs: a gentle fall toward the garage door so water and slush run out instead of pooling. Getting that slope right is one of the most important parts of the job, especially if the old floor held water.

The new floor also has to meet the door opening cleanly so the door seals at the bottom, and meet the apron or driveway outside without a lip.

Reinforcement, pour and joints

Reinforcement is placed where the job calls for it, supported so it sits within the slab. The concrete is placed thick enough for a vehicle, struck off to the planned slope and finished. Control joints are placed so the floor cracks in straight, planned lines. Isolation joints separate the new floor from the walls so they can move independently.

A smooth or lightly textured finish is common inside a garage, making the floor easy to sweep.

Before the car goes back in

The new floor needs to cure before it carries a vehicle. Walking on it comes first, then driving on it later. We'll tell you when the floor is ready for each, based on the mix, the thickness and the weather. Parking a car on the new floor too soon can mark or damage it.

Hairline cracks in the new floor

A new garage floor can still show fine hairline cracks as it cures. That's normal. Control joints keep the cracking that matters in planned lines.

Getting the garage ready

Everything has to come out of the garage before the old floor is broken out: cars, shelves, workbenches, bikes, bins and anything stored along the walls. Plan where those things will go for the length of the work and while the new floor cures. Make sure the garage door opens fully, since the door opening is the route for tear-out and new concrete.

The floor and the apron

The apron is the slab just outside the garage door that connects the floor to the driveway. If the apron has settled or cracked along with the floor, replacing them together lets the slope run cleanly from the back of the garage to the driveway. If the apron is staying, the new floor is built to meet it. The new floor won't match the color of the old apron or driveway.

Free estimate

Get your free estimate

What happens next

  1. 1You send the form.
  2. 2We get in touch.
  3. 3We come look at the job.
  4. 4We go over the plan.
  5. 5You decide.

Request Your Free Estimate

CallFree Estimate